Projects

RC-4 Canal Water Quality Improvement

View after installation of pollution control bafflebox for the City of Riviera Beach, constructed with an extensive grating system that was fabricated in house by our shop personnel

SR 710

Setting a double barrel 19×30 headwall/control structure for Ranger Construction Industries

Atlantic Crossing

Driving 40 ft long steel sheet piles to allow a 13 foot excavation for an underground parking garage for Urban5 Constructors and Mouw Associates

Big Blue Trace

72 inch storm drain installation as part of the Village of Wellington’s road restoration project

Big Blue Trace

Cofferdam installation in preparation for the Village of Wellington’s road restoration project

Clematis Streetscape

Installing drainage and watermain in the heart of downtown as part of Burkhardt Construction’s beautification project for the City of West Palm Beach